ETMC Construction Begins - Sept 2017 - Hampton Property Group
721
post-template-default,single,single-post,postid-721,single-format-standard,bridge-core-1.0.5,ajax_fade,page_not_loaded,,qode_grid_1400,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-child-theme-ver-1.0.0,qode-theme-ver-18.1,qode-theme-bridge,wpb-js-composer js-comp-ver-6.6.0,vc_responsive

ETMC Construction Begins – Sept 2017

ETMC Construction Begins – Sept 2017

Construction has commenced on the East Tamworth Medical Centre with Hampton Property Group partnering with local construction company Formline Group to project manage the construction program. Expected to take around 12 months, this 2 storey building is a suspended contract slab, tilt panel construction. The building is over 4,000 SQM of Gross Floor Area, including a 28 place undercover car park (another 50+ external car parks) and 2,606 SQM of tenanted area (NLA).

An integrated build is being undertaken for the committed tenants, meaning that their tenancy fit-outs will be completed during the construction period and allow those healthcare operators to open immediately after the build process is complete.